This project is going on and belongs to Haram extension. In this project we are responsible for MEP works for 8 floors of Haram extension, Electrical, Mechanical, Piping, Ducting, Plumbing, Chillers, Low voltage and Medium Voltage works.

Our scope includes the execution of mechanical (Plumbing, HVAC and Fire Fighting) and electrical works (Medium Voltage Transformers and Switch gears, Low/Medium Voltage cable carrying systems and cable pulling) of several sections within the total project boundary.

 We are providing suitable acoustic sound absorbent treatments for helping the Sound System design reaching the speech intelligibility objectives and Limiting the propagation of unwanted sounds such as noises from ablutions, equipment & HVAC noise, footfalls and various break-in noises, preventing excessive reverberation that can cause uncomfortable environment (subjective approach).

 

Services

  • Fire Alarm System
  • CCTV system
  • Access Control System
  • Structured Cabling Network
  • Public Address System
  • Master Clock System
  • HVAC
  • Fire Alarm System
  • CCTV system
  • Access Control System
  • Structured Cabling Network