We were commissioned to build a converged network to bring together services capable of handling over 7,000 arriving and departing passengers an hour during peak periods. In a ground-breaking design, the terminal can be switched from operating solely for arrivals to dealing entirely with departures merely by re-configuring the network accordingly.
The Terminal Built‐up Area was 70,000 square meters, with arrival and departure capacity of 3,800 passengers / hour and 3,500 passengers / hour respectively. It was a Record implementation for first phase (4 months–design to deployment) in a comprehensive pre‐staging approach.
Services Implemented
- IP Access Control System
- IP CCTV System
- IP Public Address System
- Fire Alarm & Detection System
- IP Master Clock System
- IP Telephony System (Wired & Wireless)
- IP Advertisement System
- Wireless Local Area Network (WLAN)
- High Speed Internet Services
- Data Services
- Airport Operation Database (AODB)
- Flight Information Display System (FIDS)
- Baggage Information Display System (BIDS)
- Common Use Terminal Equipment (CUTE)
- Baggage Reconciliation System (BRS)
- Resource Management System (RMS)
- Visual Guidance Docking System (VGDS)
- Gate Management System (GMS)
- Building Management System (BMS)
- Security Screening System